A reference for battery makers, importers and brands

The EU battery QR code: who needs it, what it must open, and what is still changing

From 18 February 2027, every battery placed on the EU market must carry a QR code, not only the ones that need a battery passport. The rules are spread across several texts, and some of them are still moving. This page says what applies, links each point to the text it comes from, and tells you when it was last checked.

Last checked against the texts: 6 November 2026 · What is still changing · What changed on this page

In short

1. Which batteries need what

The regulation sorts batteries into five categories. The category decides what the code opens. Art. 3(1) Art. 13(6)

CategoryWhat it isThe code opens
Portable Sealed, 5 kg or less, not designed specifically for industrial use, and not one of the types below. (point 9) The information set
SLI Specifically designed for starting, lighting or ignition; may also serve as auxiliary or backup power in vehicles, other means of transport or machinery. (point 12) The information set, plus recovered metals (section 3)
Industrial, up to 2 kWh Specifically designed for industrial uses, intended for them after repurposing, or any other battery above 5 kg that is not an EV, LMT or SLI battery. (point 13) The information set
Industrial, above 2 kWh The same, above 2 kWh. Battery passport
LMT (light means of transport) Sealed, 25 kg or less, specifically designed for the traction of wheeled vehicles driven by a motor alone or by motor and human power, and not an EV battery. E-bikes and e-scooters fall here. (point 11) Battery passport
Electric vehicle Specifically designed for traction in hybrid or electric vehicles of categories M, N or O, or of category L above 25 kg. (point 14) Battery passport

Cells and modules made available for end use, with no further assembly, count as batteries, under the most similar category, or the strictest where several fit. Art. 1(4) The rules apply whatever the battery’s chemistry, shape, weight or use. Art. 1(3) Three kinds of equipment are left out of the labelling chapter: equipment connected with Member States’ essential security interests, arms, munitions and war material (not products that aren’t specifically military); equipment sent into space; and equipment specifically designed for the safety of nuclear installations. Art. 1(5), (6)

The 2 kWh line. The Commission’s FAQ says that units which are each a complete, independently functioning battery are assessed one by one, but where they form one integrated system with common components, the complete system is the battery, and its combined capacity is what counts. Commission FAQ, Q3.3

2. Who is responsible

A summary of each role; the articles have the full duties.

You are…If…What it means for the code
Manufacturer You make a battery, or have one designed or made, and market it under your own name or trademark, or put it into service for your own purposes. Whoever re-uses, repurposes or remanufactures a battery and places it on the market counts too. Art. 3(1)(33) Art. 38(11) You must make sure it is marked. You also draw up the declaration of conformity and keep it for 10 years. Art. 38(1), (3), (4)
Treated as manufacturer You are an importer or distributor and sell it under your own name or trademark, or you modify it in a way that could affect its compliance, or change its purpose. Art. 44 All of the above.
Importer You are established in the EU and place on the market a battery from outside it. Art. 3(1)(64) You may only place compliant batteries on the market, and must check the marking first. If it isn’t right, you hold the battery back until it is. You add your own contact details, and keep a copy of the declaration for 10 years. Art. 41(1), (2), (3), (7)
Distributor You are anyone else in the supply chain who makes a battery available. Art. 3(1)(65) You must check the marking before selling, and hold the battery back if you have reason to think it doesn’t conform. Art. 42(2), (3)
Fulfilment service provider You warehouse, package, address or dispatch batteries for others. Your handling must not jeopardise their compliance, and you have some duties towards authorities. Art. 43

Batteries inside products

The regulation applies to batteries “incorporated into or added to products”. Art. 1(3) Its recitals are direct about imports: batteries from outside the EU must comply “whether imported on their own or incorporated into or added to products”, and importers are to make sure of it. Recital 71

So if you import a finished product with a battery in it, treat yourself as the importer of that battery. The Commission’s FAQ says the same for passport batteries: for a product imported with a finished, working battery installed, “the battery is normally placed on the EU market when the product is imported, and responsibility lies with the importer”. Commission FAQ, Q3.5 We have not found it saying so specifically for portable batteries, but the definitions are the same. The FAQ states that it reflects the views of its authors, and isn’t law.

The code goes on the battery, not on your product, and the text doesn’t ask a device maker to label the device itself. That doesn’t remove the importer’s duty: it is why many importers will have to ask their factory to print it.

Where the text leaves room

3. What the code must open, and from when

For batteries without a passport, Article 13(6)(b) lists “the applicable information referred to in paragraphs 1 to 5”, the declaration of conformity, the due diligence report and the waste information. All of it must be “complete, up-to-date and accurate”. Art. 13(6) Most of it is already required some other way. The dates below say when each applies, and when it has to be behind the code.

WhatAppliesText
EU declaration of conformity, drawn up by the manufacturer, on the model in Annex IX Required since 18 August 2024; behind the code from 18 February 2027 Art. 18 Art. 38(3) Art. 96(2) Annex IX
Waste information: how end-users can prevent waste and make batteries last; their role in separate collection; collection and take-back points; safety instructions, including for lithium; what the labels and symbols mean; the effects of the substances inside Required of producers since 18 August 2025; behind the code from 18 February 2027 Art. 74(1)(a)–(f) Art. 96(2)
Separate collection symbol (the crossed-out bin). On the packaging instead for very small batteries, where it would be under 0.47 × 0.47 cm On the battery since 18 August 2025; behind the code from 18 February 2027 Art. 13(4) Annex VI, Part B
Cd or Pb, above 0.002 % cadmium or 0.004 % lead On the battery already; behind the code from 18 February 2027 Art. 13(5)
Report on due diligence From 18 August 2027. Companies below €40 million net turnover are exempt, unless part of a larger group. A provisional agreement would raise that to €200 million (section 7). Art. 52(3) Art. 47 Art. 48(1)
General label details: manufacturer, category and identification, place and date of manufacture, weight, capacity, chemistry, hazardous substances, usable extinguishing agent, critical raw materials above 0.1 % 18 August 2026, or 18 months after the labelling act enters into force, whichever is later. That act isn’t adopted, so the clock hasn’t started. Art. 13(1), (10) Annex VI, Part A
Capacity (rechargeable portable and SLI), or minimum average duration and “non-rechargeable” (non-rechargeable portable) Same as above Art. 13(2), (3)
SLI only: cobalt, lead, lithium or nickel recovered from waste Probably later: the paragraph carries no delay of its own, but the figure is calculated under Article 8, whose date is 18 August 2028 or 24 months after its delegated act, whichever is later. That act is still a draft (section 7). Art. 13(6)(c) Art. 8(1)

What “applicable” means

The reading we find most natural: “the applicable information” is what applies at the time, so the label details wouldn’t be required behind the code until the label rules themselves apply. It can also be read as what applies to that category of battery, which would put every field behind the code from 18 February 2027, and some guides list them all from day one. No text settles it. The Council’s mandate would, by deferring all of paragraphs 1 to 5, including the symbol and Cd or Pb, until 18 months after the labelling act (section 7), but it isn’t law. Publishing the details you already have costs little, and covers both readings.

The code doesn’t replace the other duties

Producers, or their producer responsibility organisations, must also make the waste information available “as a minimum at the point of sale in a visible manner and through online platforms”, and distributors must provide it in their retail premises. Art. 74(1), (4)

Languages and accessibility

The waste information must be in a language or languages easily understood by end-users, as each Member State determines. Art. 74(1) The declaration of conformity must be translated into the languages the Member State requires. Art. 18(2) The recitals add that labels and QR codes should be accessible to persons with disabilities. Recital 44

4. The code itself

What it must be. A machine-readable matrix code that links to the required information, in high contrast to its background, and big enough for a commonly available reader, such as a phone. That is all Annex VI asks. Art. 3(1)(24) Annex VI, Part C The recitals add that it should respect ISO/IEC 18004:2015, the QR code standard. Recital 44 For help with the size, see how big to print a QR code.

No special identifier without a passport. The unique identifier and the ISO/IEC 15459 standards are in Article 77(3), which is about passports. We found nothing that asks batteries without a passport for GS1 codes or a unique identifier per battery. Art. 77(3)

Where it goes. “Printed or engraved visibly, legibly and indelibly on the battery.” Where that is “not possible or not warranted on account of the nature and size of the battery”, it is affixed to the packaging and to the documents accompanying the battery. Art. 13(7)

One code per model, or per lot? Nothing asks for one per battery. The catch is that the label details include the place and month of manufacture, which differ between lots. Where putting the date on the label causes disproportionate costs, the draft labelling act would let it stay elsewhere on the battery, with the label saying where. Draft act, Art. 1(8) One page per model can then work, as long as the model comes from one plant and your declaration covers every batch the page serves: the declaration’s model asks for “batch or serial number”. Annex IX, point 1 Otherwise, make one page per plant or per declaration.

How long it must work. No period is set. The recitals say the code is there “to ensure the availability of information over time” (Recital 44), and the declaration must be kept for authorities for 10 years (Art. 38(4)). A battery can be discarded long after it is sold, so plan for its whole life, and make sure a printed code doesn’t depend on a subscription someone might stop paying.

Used batteries. Batteries prepared for re-use or repurposing, repurposed or remanufactured need new markings, with their change of status reachable through the code. Art. 13(9)

5. Stock and the date

The duty attaches when a battery is placed on the market, which means first made available in the EU, not when it was made, and not when its model first went on sale. Art. 3(1)(16) Art. 38(1) Art. 41(1) The recitals say it outright: batteries “placed in stock in the Union by distributors, including retailers, wholesalers and sales divisions of manufacturers, before the date of application of relevant requirements of this Regulation do not need to meet those requirements”. Recital 11

The Commission’s Blue Guide on EU product rules, which is general guidance rather than battery law, adds two points. The concept “refers to each individual product, not to a type of product”, and a product is not yet made available while it is “in the stocks of the manufacturer (or the authorised representative established in the Union) or the importer”, not being supplied. Blue Guide 2022, section 2

So shops can sell through what they already hold, and each battery is judged on its own date. Don’t stretch this to a container that lands on 19 February: the Blue Guide says that goods declared for release for free circulation can “generally be considered” as being placed on the market, and the Commission’s FAQ says a battery inside an imported product is “normally placed on the EU market when the product is imported”. Commission FAQ, Q3.5

6. If your battery needs a passport

E-bike, e-scooter, electric vehicle and industrial batteries above 2 kWh need much more than a page. olinqs doesn’t make battery passports, so this is only an outline of what differs.

Who issues it, according to the Commission’s FAQ: whoever completes the finished, working battery and places it on the market. If a finished battery is supplied and a vehicle maker merely installs it, the battery manufacturer is responsible; if the vehicle maker completes it, for example by adding the battery management system, the vehicle maker is. For a product imported with a finished battery installed, it is normally the importer. Authorising someone else to do the work doesn’t transfer the legal responsibility. Commission FAQ, Q2.1, Q2.3, Q2.5, Q3.5

7. What is still changing

The state of each text on the date at the top of this page, with the place to check it yourself. A draft or a mandate is not law.

TextWhere it standsWhat it would change
Omnibus VIII, amending the regulation (COM(2025) 981)
Parliament’s file Council mandate Draft report Amendments
Commission proposal of 10 December 2025. Council mandate agreed on 24 June 2026. Parliament’s committee hasn’t decided: its rapporteur’s draft report and the amendments to it are not voted. First plenary date pencilled for 14 December 2026.

Commission: doesn’t mention the QR code or the passport. Would narrow the label’s hazardous substances to substances of very high concern at or above 0.1 %.

Council: rewrites Article 13(6). The same date, with the declaration, due diligence report and waste information from 18 February 2027, and “the applicable information referred to in paragraphs 1 to 5” (so also the symbol and Cd or Pb) from 18 months after the labelling act enters into force. Would use a set of substances of concern above 0.1 %, on the label and in the passport.

Parliament, not voted: the rapporteur’s draft would let a digital label fulfil physical label and document requirements, with conditions and exceptions (amendment 6), and exempt some passport batteries under earlier contracts until 18 February 2033 (amendment 9). Tabled amendments would replace the date with 18 months after the labelling act (amendment 63), and exempt some batteries placed on the market exclusively as vehicle spare parts (amendment 40).

Labelling act (Article 13(10))
Commission page
Due by 18 August 2025. Draft published on 15 December 2025; feedback closed on 26 January 2026. No adopted text listed. Starts the 18-month clock for the label. The draft would: provide the label information through a QR code for batteries not immediately visible inside products, with the code on the battery and in the product’s documents, and a battery icon if also shown on the product; for products whose battery only professionals may replace, and sterile ones, put the code in the documentation; have button cells’ information on the packaging or a document; put the code first when space is short; allow one language on the physical label with the others behind the code; let the date of manufacture sit elsewhere on the battery where it would cost too much; and add cranking current for SLI batteries. Draft, Art. 1, 5, 6, Annex II
Omnibus IV (COM(2025) 501)
Parliament’s file
Provisional agreement (PE790.249) approved in committee on 2 July 2026. Not yet voted in plenary; date pencilled for 23 November 2026. Would raise the due diligence threshold from €40 million to €200 million (the Commission had proposed €150 million), and make the report due within a year of 18 August 2027, then at least every five years and after any significant change.
Recycled content method (Article 8)
Commission page
Draft delegated act; feedback closed on 9 September 2026. No adopted text listed. SLI batteries: the date of the recovered metals figure runs from this act.
Access to passports (Article 77(9))
Commission page
Due by 18 August 2026. Draft open for feedback until 16 November 2026; adoption planned for the last quarter of 2026. Passport batteries only: who counts as having a legitimate interest, and what they may see.
Removability exemptions (Article 11)
Commission page
Delegated act adopted by the Commission on 14 July 2026 (C(2026)5031), which enters into force only if Parliament and the Council don’t object Art. 89(6). We haven’t confirmed its publication. Article 11 applies from 18 February 2027. Under the Council’s mandate, it wouldn’t apply to the products that act covers until 18 August 2028. The rapporteur’s draft would apply it from 18 February 2030 for products in Article 11(2).

8. Other duties on the same batteries

The code is one duty among several. Most of these already apply.

9. Common mistakes

10. Checklist

  1. Work out each battery’s category (section 1). If it needs a passport, find a service that makes them.
  2. Work out your role for each one: manufacturer, importer or distributor (section 2).
  3. Ask your supplier for the declaration of conformity, and whether the battery will carry a code, and to what.
  4. If nobody will provide the page, publish it yourself: it can be on your own website or a service.
  5. Put on it the declaration, the waste and safety information in the right languages, the markings, and the label details you have.
  6. Get the code printed on the battery; if its nature and size make that impossible or not warranted, on the packaging and the documents.
  7. Scan the real print with an ordinary phone.
  8. Keep the page up to date, for the battery’s whole life. Check section 7 before your next print run.

How olinqs can help

We make the page and the code for batteries without a passport. It won’t make a battery compliant: the declaration, the markings and the accuracy of what you enter stay your responsibility.

Sources

What changed on this page

This guide explains the rules; it is not legal advice. Recitals explain a regulation but don’t bind on their own, the Commission’s FAQ and guidance state that they reflect the views of their authors, and only the Court of Justice of the EU interprets EU law with authority. When in doubt, ask your national market surveillance authority. Found a mistake, or a text that has moved? Tell us.